Fact

00200ca3c5281081d9514cb1e4396f885d336b113c4be6f53da10e060f5417c8
Field Value
Fact 00200ca3c5281081d9514cb1e4396f885d336b113c4be6f53da10e060f5417c8
Field description
Value Development by a gas transporter required for the purposes of its undertaking consisting of: (a) the laying underground of mains, (b) the installation in a gas distribution system of apparatus for measuring, controlling or varying the pressure, flow or volume of gas, and structures for housing such apparatus; (c) the construction in any storage area or protective area specified in an order made under section 4 of the Gas Act 1965 (storage authorisation orders)(65), and the erection or construction in any such area of any plant or machinery required in connection with the construction of such boreholes; (d) the placing and storage on land of pipes and other apparatus to be included in a main or pipe which is being or is about to be laid or constructed in pursuance of planning permission granted or deemed to be granted under Part 3 of the Act (control over development); (e) the erection on operational land of the gas transporter of a building solely for the protection of plant or machinery; (f) any other development carried out in, over or under the operational land of the gas transporter.
Entity Gas transporters
Earliest entry date 2020-12-31
Latest entry date 2020-12-31
Latest resource 36ed5f13e3d37cdc5808ce5fe9bcd73b7a65cf04cf2e6ecd36477d88c1a2eef6
Resources
Entry Date Resource
2020-12-31 36ed5f13e3d37cdc5808ce5fe9bcd73b7a65cf04cf2e6ecd36477d88c1a2eef6
2020-12-31 86611a73da35d11cf63230e75bf600ed8386eb1372cfbad704595a7dcc6b2694
2020-12-31 ae2e4bbadda50a227712436158814ed60caffa22d987f24aacbd0ac2ab529b46
2020-12-31 bf83c948bf1997dc4aac377c7dc32c8b3e6ff5002b5652bbf519d02e47a6fee7
2020-12-31 c6a8ea056065e65725671b5405c0a4a1e1473d2c01374198fb37edbe05779f67
2020-12-31 ff0afb2fe819469b2718da7b35db4f0cf23456d17b5fb3835baba49a68c7957e